Infrastructure Projects

About the product
Khalifa Bin Salman Port & Industrial Area at Hidd, Bahrain

Key Construction Elements :
24,000,000 cubic metres of dredged fill
12km of revetment protection and breakwater comprising:
1,300,000 cubic metres of quarry run bund core
650,000 cubic metres of secondary armour, filter stone toe berm etc
450,000 cubic metres of primary armour
Vessel berthing facilities comprising:
1,800 line m of gravity block quay wall with minimum 15m depth designed for containers,
general cargo, dry bulk and roll-on roll-off traffic
small craft berths
Price
BD 80,450,000
Contact with supplier
BACK TO TOP